When the ability grid needs additional electricity to meet need, the liquid air is 1st pumped to a greater stress then heated, and it turns back again into a gas. This significant-force, large-temperature, vapor-phase air expands in a very turbine that generates electricity for being despatched back into the grid.A Management system can be operated